About the project

Atlantic County Utilities Authority (ACUA) operates a solid waste landfill at Egg Harbor Township, New Jersey. The facility was running out of storage volume. Hence, there was a need to store more solid waste over the next 20 years.

 

Landfill expansion traditionally involves using open land adjacent to the existing landfill and designating it for lateral expansion. This entails an
expanded footprint for the landfill. It has become increasingly difficult for landfill owners and operators to expand laterally due to cost, space constraints, community objection, and environmental regulations.

Due to space constraints around the landfill, the optimal option was to raise the height of the existing landfill. The existing fill was supported by an enclosed containment berm, designed as an MSE wall. However, this structure was not adequate to accommodate additional volume of waste over the next 20 years. With the space available to ACUA around the existing berm, it was decided to construct another peripheral berm of MSE beyond the existing berm, designed for the additional height. This called for an aggressive and a well-planned construction schedule.

 

The Strata team worked diligently to meet the expectations. The reinforced backfill material to be used was Reclaimed Asphaltic Pavement (RAP), a material removed and/or reprocessed when roadways are resurfaced. Extensive testing was performed on the proposed backfill and StrataGrid™ at a third-party laboratory to ensure suitability for the project.

 

Strata supplied this project with master rolls of StrataGrid™. Each roll was 12.5 feet wide and 1,440 feet in length. A spooling operation was established by the contractor to ensure an efficient and fast deployment of the primary geogrid reinforcement. Master rolls of StrataGrid™ limit waste on site, saving time and money.

 

The key advantage of a Strata MSE berm is that the landfill owner can expand its waste capacity without expanding the footprint of the existing landfill. The cost and speed of construction are key deciders that favor our product. The use of StrataGrid™ wrap and wire form facing ensures a flexible structure, and the effects of differential settlement do not manifest on the structure.

image-1

CONSULTATION

From know-how to manufacture, installation and support.

Strata not only provides geotechnical products, but our team of 200+ engineers can help you with your turnkey project by supplying you with technical knowhow and support as to how our products can help you finish your projects in time while keeping costs down.

Send us your queries and we will get back to you with our expertise.

More success stories

StrataWeb® geocells – A slope erosion protection system for embankments

StrataWeb® geocells – A slope erosion protection system for embankments

The Jordan Ministry of Energy and Mineral Resources (MEMR) was planning to build a petroleum strategic reserves terminal in the east of Amman, Jordan. They wanted to increase the petroleum storage capacity in the area, which required an increase in the base width of the embankment. The slopes of the embankment required protection from slope erosion.

Read more
Slope protection of partial wall on flyover using StrataWeb® geocells

Slope protection of partial wall on flyover using StrataWeb® geocells

The ramps of the grade separators are constructed either as embankments with natural slopes or as reinforced soil walls. In the case of partial walls, where sloped embankments are supported on reinforced soil walls, the embankment slopes needed to be given adequate protection against soil erosion, which could otherwise damage the fascia of the underlying reinforced soil wall and also induce seepage into the system. The slopes of the embankments were of the order of 30° with the horizontal. The reinforced soil walls supporting the embankments were as high as 10 m. The heights of the embankments were of the order of 5 m.

Read more
Rehabilitation of road in the busy city town centre in Karnataka

Rehabilitation of road in the busy city town centre in Karnataka

Monsoons in North Karnataka are notorious for damage to roads. The site was plagued with problems like reflective cracks, potholes, undulating surfaces etc., resulting in slow traffic movement and heavy vehicular damage. This stretch had to be rehabilitated time and again over the past several years, and no solution was proving to be long-term. Since the area is a major commercial hub, it was impossible to close off this section for an extended period completely, so a quick but long-term solution was needed.

Read more