LOCATION

Chilling 400kV Substation, Hook, Nr Fareham, UK

CLIENT

National Grid

PRODUCT USED

StrataWeb®

APPLICATION

Ground stabilisation for substation works

About the project

Chilling Substation has been a part of the UK’s high-voltage power network for over 40 years. New equipment had to be installed at the existing facility to enable the export and import of up to 1000 MW of power (enough to power 1 million homes). Critically, all the work had to be completed within the existing site footprint without disrupting the surrounding area or local residents.

Strata’s StrataGrid™ and StrataWeb® were recommended by the client to build the slopes and grow vegetation, allowing an aesthetically pleasing design. Around the north-western, northern, and southern perimeters, the existing slopes were cut back into the Selsey Formation and regraded to face angles of 45–60 degrees, with the slope heights varying from 1.2m to 3.2m. In order to hold seeded topsoil on the slopes, Strata’s 150mm deep StrataWeb® cellular confinement system was used. It was held in place with fixing pins and anchor trenches at the toe and beyond the crest of the slope. There was also an area of fill along the eastern boundary, where a 1.2m high reinforced soil slope was designed using StrataGrid™.

Strata’s innovative solution not only satisfied the structural requirements for the steepened soil slope but also accommodated vegetation. This resulted in an economic, fast, and smooth construction process.

image-1

CONSULTATION

From know-how to manufacture, installation and support.

Strata not only provides geotechnical products, but our team of 200+ engineers can help you with your turnkey project by supplying you with technical knowhow and support as to how our products can help you finish your projects in time while keeping costs down.

Send us your queries and we will get back to you with our expertise.

More success stories

Ground improvement for reinforced soil wall using StrataWeb® Geocells for Arjungunj, U.P.

Ground improvement for reinforced soil wall using StrataWeb® Geocells for Arjungunj, U.P.

The client was seeking a solution for the ground improvement for the construction of a Reinforced Soil Wall for ROB 208 Arjungunj, U.P., India. The approach was designed for a maximum height of 10 m.

Read more
Ground improvement of the industrial floor using StrataWeb® geocells

Ground improvement of the industrial floor using StrataWeb® geocells

Due to the site’s location, the conventional method of soil replacement was not a feasible technique, as it would have been a tedious task to replace the soil up to 2–3 meters from the OGL.

Read more
Ground improvement using StrataWeb® geocells and StrataGrid® Biaxial (SGB) geogrids

Ground improvement using StrataWeb® geocells and StrataGrid® Biaxial (SGB) geogrids

This project involved ground improvement below the reinforced soil wall structure at National Highway 28, Gorakhpur, UP. This highway provides the main connectivity from India to Nepal, also connecting main cities in Uttar Pradesh. The site is in a high-flood zone and has a very high water table during monsoon months. Therefore, the conventional method of soil replacement was not feasible. Also, solutions like stone columns, sand piling were time-consuming and very expensive.

Read more